/cdn.vox-cdn.com/uploads/chorus_image/image/39296000/2008_05_rushstreetsignage-thumb.0.jpg)
Passing through downtown Culver City the other day, we noticed the new signage on Rush Street, but as you can see, there's still a lot of work activity happening in there. Plywood still up, no glass in those windows, etc. We're told there's still a couple more weeks of construction left, which makes it unlikely it bows this month. If it happens in May, it will be just barely. The former sign shop will have a large sidewalk patio, a 35-foot bar (the largest, they say, in Culver City), a lounge and dining room downstairs, and a second-floor lounge with CC's only roof-top patio, and that friends, everyone wants for summer.
· Plywood Report: Rush Street [~ELA~]
· Plywood Report Culver City Edition: Gyenari, Chipotle, Rush Street [~ELA~]